contaminated materials high temperature burners for the treatment of contaminateds materials. The waste will definitely be […]
Waste Incinerator Capacity The waste incinerator units shall be designed to burn medical waste load of […]
Managing waste in remote areas presents unique challenges, primarily due to the lack of infrastructure and […]
Animal Crematory Burner Ability: Normal 80kgs per feeding Thing Spec Layout A900 Interior Measurements 120 x […]
a.) incinerator for waste. VS cremator for animals b.) incineration to be ash and clean it. VS […]
Containerized Incinerators for Mining Operations: Optimizing Waste Management in Harsh Environments Mining operations generate significant amounts […]
Waste-to-energy Incinerators for Solid Waste Treatment in Industries Innovative, Eco-Friendly Solutions by HICLOVER Industrial sectors today […]
Mobile Containerized Waste Incinerators pets or human cremation emergency use Model CA-200 Picture Burning Rate Average […]
Light Weight Small-Scale Medical, Mobile Optional Type Model YD-30 Picture Burning Rate average 30 kgs/hour […]
The burning and incineration method used is a major factor in determining what type of waste […]
Medical Incinerator: Advanced Solutions for Medical Waste Management In today’s increasingly complex healthcare environment, efficient and […]
HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator Tel: +86-25-8461 0201 Mobile: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/ Email: [email protected]Email: [email protected] Nanjing Clover Medical Technology Co.,Ltd. Item Serie No. Part Name […]
Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature: 1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin
Basic Info. Model NO.:solid waste incinerator suppliers for the lab Export Markets:Global Product Description Nanjing Clover […]
Portable Waste Incinerator: Ease of Transport and Setup When it comes to waste management in remote […]