Waste Incinerator Equipment Manufacturer   

    Medical Waste / Animal Pet Cremation / Solid Waste Incineration   

  

     

  




Tel: +86-25-8461 0201
Fax: +86-25-8461 0406
Email: sales@clover-incinerator.com
Skype: clover-incinerator
Twitter: twitter.com/hiclovercom
Facebook: www.facebook.com/hiclover

 Incinerator Project Case

Incinerator YD-30 for Australia

Incinerator YD-50 for Moldova

Incinerator YD-100 for Iraq

Incinerator YD-150 for Morocco

Incinerator YD-300 for Somalia

Incinerator YD-500 for Vietnam


 Medical Waste Incinerators

30kgs per hour&Model YD-30

50kgs per hour&Model YD-50

100kgs per hour&Model YD-100

150kgs per hour&Model YD-150

300kgs per hour&Model YD-300

500kgs per hour&Model YD-500

Waste Incinerator Manufacturer

Email: info@hiclover.com  Tel: +86-25-8461 0201

  Medical Waste Incinerator YD Model is our classic product for market. All series included burning capacity 10kgs per hour, 30kgs per hour,50kgs per hour,100kgs per hour,150kgs per hour,300kgs per hour,500kgs per hour. Up to now, all models sale to all over the world and have good feedback from end-customer. The YD Model medical incinerator have multi-combustion chamber and basic dry scrubber (smoke filter chamber) with reasonable project budget. For the cleaner emission require, we accept custom made wet scrubber for incinerator and this will be also our next working by focusing on emission technical.

  Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.

  Now, please download "Product Request Form (Word Format, 51KB)", complete and send back to us. Email: info@hiclover.com

  Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy. 

  All our incinerator use stainless steel chimney, not steel.

  All our incinerator have two combustion chamber at least, not single chamber.

  All fuel burner from Italy made with famous brand, best quality.

  300kgs per hour burning rate incinerator is well liked by market because this model can be medical waste incineration equipment for big hospital and also very good for other solid waste treatment with lowest cost, even if big size animals also can be feed into the combustion chamber. The primary combustion chamber volume is 2.4m3, big enough for common size animals. For shipping transport, YD-300 can be loaded into 40'feet full high container.

  Big size combustion chamber up to 4.0m3 and Internal Dimensions is 257 x 147 x 108cm with feeding door opening 108 x 128cm. This model can be a small waste incineration factory with little amount of budget funds. If end customer use this for farm to burn animals like cow, horse or camel, no problem!

An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial installation, commissioning and operational training under the supervision of the manufacturers technician. The incinerator is to be maintained and operated to manufacturers specifications by trained personnel. Contractor must have sufficient personnel trained and competent to operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A.

 

Incinerator Use/Ash Collection

Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance.

Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be incinerated.

All ash will be collected and stored in individual storage bins for each particular waste stream. The bins are to be provided by the contractor to the same design as the storage bins for the raw waste streams and include a lid design that prevents contamination from water.

Ash from each waste stream will be sent for laboratory analysis after each initial incineration by the Company and at intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as directed by the Company. The Contractor will be responsible for the security of samples taken to prevent contamination until collection by the Company or designated courier.

Ash will be disposed of at the direction of the Company. It is the responsibility of the Contractor to ensure the ash is not compromised until final disposal. Company will provide additional storage area for ash if and as required.